Located in Saraland, AL. Completed on time.
Total Cost of Project: $22 MM
Located in Mobile, AL. We installed a new sprinkler system, as well as, HVAC and Electrical Upgrades. This project was completed 4 months early and under budget.
Total Cost of Project: $3 MM
Located in Satsuma, AL. We completed HVAC and Electrical Upgrades two months early and under budget.
Total Cost of Project: $5 MM
Two Separate High School Gyms at Different Sites. Completed on-time and under budget
Total Cost of Contract: $5 MM
Located in Brookhaven, MS. For this project there were 10 Phases of construction which included both additions and renovations. We are managing over 120 changes to the contract to date. This amounts to over $1.2 MM in changes to date.We also worked with the owner and engineer to change from 7 phases to 10 phases of construction in order to complete the renovation while the owner continued to occupy the building.
Total Cost of Project: $10.5 MM
The renovation of the Mobile Public Library was a historical renovation and addition. There were over 100 changes to original contract and yet again we completed the project on-time and under budget.
Total Cost of Contract: $8 MM
There were over 800 Auger Cast Piles and Concrete. We brought the project back from being 4 weeks behind schedule in only 6 weeks of work to being completed on-time which equated to dollars saved. There were over 100 Changes to original contract that we managed. We also built the radiation rooms for the Tomotheraphy System, Cyberknife, and PET/CT Scanner. For this portion of the contract there were over 110 Changes to original contract.
Total Cost of Contract: $10 MM